Yes, though with my current value-estimates that’s as close as I can get to the same relative expected utility without doing some heavy number-crunching that isn’t warranted considering both the situation and the accuracy of my estimates.
Yes, though with my current value-estimates that’s as close as I can get to the same relative expected utility without doing some heavy number-crunching that isn’t warranted considering both the situation and the accuracy of my estimates.