I needed 9. There’s not enough time to get utility U out of the project, so the right thing to do is to get U-100 out of it, and there’s time for that. Owning up to it doesn’t make it worse.
I needed 9. There’s not enough time to get utility U out of the project, so the right thing to do is to get U-100 out of it, and there’s time for that. Owning up to it doesn’t make it worse.