There’s a drydock in Portland, OR long enough to accommodate up to a 366m ship, and the Leif Eiriksson is 213m. I don’t know about Manson Construction Co, but it seems like if the shipyard size is the constraint, there are places in the USA that can accommodate.
Does Manson Construction Co actually have access to a shipyard that’s big enough to build a dredger that’s 4x bigger than what they want to build?
From the podcast it sounded like shipyards that are big enough might be the constraint.
Yeah that’s one of my main concerns as well as far as just building a single dredger.
There’s a drydock in Portland, OR long enough to accommodate up to a 366m ship, and the Leif Eiriksson is 213m. I don’t know about Manson Construction Co, but it seems like if the shipyard size is the constraint, there are places in the USA that can accommodate.