One idea for the metric would be to elicit pairwise comparison between projects continuously, and derive ELO rating from it. The biggest advantage of this system is that it requires much less time to compare two projects rather then give some form of rating to it like: X reduction of p(Doom)
One idea for the metric would be to elicit pairwise comparison between projects continuously, and derive ELO rating from it. The biggest advantage of this system is that it requires much less time to compare two projects rather then give some form of rating to it like: X reduction of p(Doom)