1990-12-19: 2010
1994-10-04: 2011-12-31
2006-11-17: 2014-12-31
2010-07-10: 2015-10
2011-08-02: 2018 (Fall) to 2020
2013-07-29: 2019 or 2020.
2016-12-08: 2021
2021-06-21: 2022-05
2022-02-24: 2022 (Late Summer)
2022-08-05: 2022-11 (Late in the month)
2022-11-17: 2022-12-12
(Thanks to u/Master_Dogs on reddit for helping me compile these.)
Current theme: default
Less Wrong (text)
Less Wrong (link)
Arrow keys: Next/previous image
Escape or click: Hide zoomed image
Space bar: Reset image size & position
Scroll to zoom in/out
(When zoomed in, drag to pan; double-click to close)
Keys shown in yellow (e.g., ]) are accesskeys, and require a browser-specific modifier key (or keys).
]
Keys shown in grey (e.g., ?) do not require any modifier keys.
?
Esc
h
f
a
m
v
c
r
q
t
u
o
,
.
/
s
n
e
;
Enter
[
\
k
i
l
=
-
0
′
1
2
3
4
5
6
7
8
9
→
↓
←
↑
Space
x
z
`
g
Green Line Extension Opening Dates
Link post
Talk of extending the Green Line from Lechmere to Ball Square and Tufts goes back a very long way, but it’s finally open!
In celebration, I wanted to go back and collect the completion dates we’ve been given over the years:
1990-12-19: 2010
1994-10-04: 2011-12-31
2006-11-17: 2014-12-31
2010-07-10: 2015-10
2011-08-02: 2018 (Fall) to 2020
2013-07-29: 2019 or 2020.
2016-12-08: 2021
2021-06-21: 2022-05
2022-02-24: 2022 (Late Summer)
2022-08-05: 2022-11 (Late in the month)
2022-11-17: 2022-12-12